How we build your smart home, in 9 steps.

A smart home that works on day one is planned, checked and tested long before any programming. Here is the full journey, from the first drawing to support after you move in.

9
Steps
2
Site checks
1 year
On-site support
Plan→Check→Design→Build→Hand over
  1. 1

    Step 1 · Plan

    Wiring plan and keypad placement

    Every circuit, sensor loop and keypad position is marked on your architectural drawings before work starts. We agree cable routes and mounting depths with your architect and electrician early, so nothing has to be redone.

    • Lighting circuit drawings
    • Keypad and sensor layout
    • Cable schedule for your electrician
  2. 2

    Step 2 · Check

    Site checks before and after wiring

    Our engineers visit twice: once before cabling to check the conduit paths, and once after cabling to check the cables, insulation and box depths before the walls are closed.

    • Conduit route check
    • Cable check report after wiring
    • Wall depth and back-box sign-off
  3. 3

    Step 3 · Check

    Lighting circuit and wiring test

    Every lighting circuit, load and sensor line is powered up and tested before any automation is programmed, so voltage, phase balance and load types are confirmed.

    • Load and phase balance check
    • Voltage and insulation test
    • Circuit sign-off before programming
  4. 4

    Step 4 · Design

    Keypad design and your own scenes

    You choose keypad finishes that match your interiors, and the words or icons on each button. We design your scenes: lights, curtains and climate set for morning, dinner, movies and night.

    • Keypad finish and button labels
    • Scenes designed room by room
    • Climate and curtain presets
  5. 5

    Step 5 · Build

    Cabinet and keypad installation

    The automation cabinet is mounted, neatly wired and labelled. Wall keypads and sensors are fitted flush, and every connection is written down.

    • Neat, labelled DIN-rail cabinet
    • Flush-mounted keypads and sensors
    • Every circuit labelled
  6. 6

    Step 6 · Build

    Programming and logic

    Our engineers program the logic: dimming curves, curtain timings and multi-room rules. Scenes, climate schedules and presence logic are tuned and tested in every room.

    • Lighting and climate logic
    • Dimming and curtain timing
    • Scenes working across rooms
  7. 7

    Step 7 · Build

    App and voice set-up

    The app is laid out by room and activity, and set up for each family member with their own secure access. Voice assistants and alerts are switched on.

    • App laid out by room
    • Secure access for each family member
    • Alexa, Google Home and Siri
  8. 8

    Step 8 · Hand over

    Handover and final testing

    We walk through every room with you and test every button, scene and app control. We show you how to change settings, and hand over the full drawings of what was built.

    • Room-by-room walkthrough
    • As-built drawings and documents
    • Training for the whole family
  9. 9

    Step 9 · Hand over

    One year of on-site support

    Every home includes a full year of on-site support after handover. Our engineers come back to fine-tune scenes and schedules, or to look after the hardware when needed.

    • 12 months of on-site visits
    • Free scene and schedule fine-tuning
    • Priority support from our team
Good to know

Timing, quality and wireless projects

Timeline

Planning and drawings usually take 1 to 2 weeks. Installation follows your builder’s fit-out schedule, and final testing happens just before you move in.

Two site checks

We inspect the site before wiring and after wiring, and power up and test every circuit before anything is programmed.

Wired or wireless

The steps above describe a wired home. Wireless and retrofit homes follow the same five phases, with hubs and mesh placement instead of cabinets and wiring. Wired vs wireless →

Questions

Questions about the process

How long does the process take?

It depends on the size of the project and your construction schedule. Planning and drawings usually take 1 to 2 weeks, installation follows your builder’s fit-out, and final testing happens just before you move in.

Do I need to be on site for every step?

No. We need you for the first layout review, choosing keypad finishes, and the final walkthrough. We handle the checks, testing and programming ourselves.

Can scenes and schedules be changed later?

Yes. Scenes, schedules and button settings can be changed any time, and in the first year this fine-tuning is free.

How is it different for wireless or retrofit projects?

The same five phases apply: plan, check, design, build and hand over. The focus moves from cabinets and wiring to mesh placement, hubs and a secure home network.

What support is included after handover?

Every home includes one full year of on-site support. Our engineers visit if the hardware needs attention or your settings need changing.

Ready to plan your smart home?

Share your floor plan or drawings. Our engineers will review them and design a system for your home.